Your helpdesk tells you the job is closed. It cannot tell you the plant came right.
Until now you have had to take the helpdesk's word that the job is done.
Book 20 minutes on a screen- You sign a monthly report you cannot check.It is what your engineers and subcontractors typed in.
- You find out from your client.A job that did not fix the plant comes back as a complaint or a deduction.
- You pay for the same fault three times.Each visit is closed inside its time, and the fault is still there.
- Faults that are not yours are held against you.Without the readings you cannot show it was a subcontractor, the builder or the client.
- A standby is out of service and nobody knows.If the duty plant fails, there is nothing behind it.
- You take over a building without knowing what is wrong with it.What was already wrong on day one becomes yours.
What you see instead · each morning
Theatres 3 and 4 have no standby cooling. Chiller 2 was closed as repaired on Thursday and has reached 82% of its design flow on each of three starts since. Chiller 1 is booked out for its planned service tomorrow at 08:00. Decide today: move the service, or get chiller 2 proven first.
Chiller 2
Work orderClosed Thu 12 Nov. Strainer cleaned.
The plant82% of design flow on 3 starts since. 38 kPa across the strainer, against 12 on chiller 1.
To doSend the chiller subcontractor back.
Hot water calorifier 2 · block B
Work orderClosed Tue 10 Nov. Primary valve replaced.
The plantFlow temperature has stayed at 52°C since. The agreed temperature is 60°C.
To doSend the engineer back.
Generator 2 · monthly test
Work orderPlanned job closed Fri 13 Nov. Test complete.
The plantRan for 12 minutes and took no load. The agreed test is 60 minutes on load.
To doRun the test again on load.
CIDE-OS FM Director reads your work orders and the plant together, read-only. It checks every closed job on plant against what the plant did afterwards, and tells your contract manager the same day which ones did not fix it. They are finished before your monthly report goes in.
It is for hospitals, prisons, data centres and laboratories. It starts on the day you take the building over.
Book 20 minutes on a screenWhat is closed, and what is proven.
This is the page for an example hospital on a hard FM contract. 168 jobs on plant were closed this month. The plant proves 154 of them. The rest of the same page is below.
- Your own engineers6
- Your specialist subcontractors5
- The builder, still in the defects year2
- Your client. A unit switched off on the ward.1
- Valves and fans left in hand6
- Isolations still on2
- Boiler flow setpoint, 70°C down to 60°C on Wed, not put back1
- Chilled water pump CHWP-2, inverter trip4 jobs
- Lift 3, door fault3 jobs
- Fan coil 9-14, ward 93 jobs
The report is right when it goes in.
A job that was closed and did not fix the plant is back with your contract manager the same day, as a job to finish. The page also shows what those jobs would do to your score and your deductions, on your contract's own rules. The figures here are example data.
Evidence when it is not yours.
Some of what is held against you belongs to a subcontractor, to the builder in the defects year, or to the client. Each one is shown with the readings and the times, so you can pass it on with the evidence.
What was left in hand after the visit.
A valve left in hand, an isolation left on, a setpoint turned down for a test and not put back. The page lists each one the same day, with the plant and the time it changed.
The same plant on its third job.
A fault that comes and goes is the hardest kind to find, because nobody is there when it happens. The page lines up every occurrence to the second, across the systems, and shows what happened first each time.
Know what you have taken on, from the day it is connected.
When you take over a building, CIDE-OS FM Director reads the systems your client agrees to and sets what the plant is doing against its commissioning record and its design.
What was already wrong on day one.
Plant in hand, standby out of service, sensors that do not read, systems that have drifted from how they were commissioned. Each is recorded with its date, so it is on the record as inherited.
It can start with the commissioning record.
Where CIDE-OS Commissioning Optics ran on the building during commissioning, you start with the record of every system as it was proven. A fault in the defects year is checked against it.
Three visits. Three jobs closed, all inside their time. The ward is still warm.
Ward 6 is too warm at night. The ward sister rings the helpdesk on Tuesday morning.
An engineer attends that afternoon. He finds the heating valve on AHU-7 passing, fits a new actuator, drives it open and shut to test it, and closes the job. It is inside its time.
On Tuesday night the ward is warm again. A second job is raised. The BMS subcontractor logs in remotely, sees the setpoint is right and the plant is running, and closes it as no fault found. It is inside its time.
On Wednesday night it is warm again. A third job goes to mechanical. They check the heating circuit and find nothing wrong. It is closed inside its time.
The monthly report shows three jobs, all completed in time. The ward has been warm for three nights and the client has started to keep his own list.
On the first visit the new actuator was put in hand at the controller to test it, and it was left in hand, fully open.
What CIDE-OS FM Director does
It reads the work order and the plant together. It knows which job was open on AHU-7, and it reads the valve. The rule your engineers signed off says a valve is back in auto when its job is closed. With a direct connection to your work order system, your contract manager has this on the Tuesday afternoon, under twenty minutes after the first job is closed:
The engineer is still in the building. The valve is back in auto by half past three. There is no second job and no third.
The same job, read by three people
Put the AHU-7 heating valve back in auto. It was left in hand at 14:52.
Job 48213 was closed with the valve left in hand. It is not fixed. One engineer, ten minutes.
Ward 6 will be warm tonight unless one valve is put back in auto this afternoon. It is in hand now.
Six checks on every plant job, read from the plant.
Most FM systems turn an alarm into a job. We have not found one that checks the job against the plant after it is closed. CIDE-OS FM Director does.
Did the plant come right?
After a job is closed, did the reading it was raised for go back to where it should be, and did it stay there. Flow, temperature, pressure, power, status.
Was the planned job done?
Did the generator take load on the day the test was logged. Did the pressure drop across the filter fall after the change. Did the hot water reach temperature on the flush. It does not replace your statutory records.
How was the plant left?
What was put in hand, overridden, isolated or changed during the visit, and whether it was put back.
Has it come back?
The same plant on a second, third or fourth job, with every occurrence lined up across the systems.
Whose is it?
Your own team, a subcontractor, the builder or the client, with the readings that show it.
What does it mean for the building?
Where a job leaves a standby out of service, the page says what depends on it and how long there is.
It checks plant and systems with a reading.
Heating, cooling, ventilation, water, power and standby. Also lifts, fire dampers, emergency lighting tests and doors on the access control system, where they have a reading. Doors, lights, taps and fabric with no reading are not checked and are not on the page. Where a reading matters and is missing, we can fit our own wireless sensors.
What your engineers already know about the building, written down.
The readings on their own are only a lot of points. The operational logic is what makes the page right. We write it with your engineers, one system at a time, and you sign it off before it is used.
What fixed looks like.
For each kind of job, what the plant should read when it is right, and for how long. A strainer clean on a chiller is proven when the chiller holds its design flow on its next three starts. That is how a closed job is checked.
What depends on what.
Chiller 2 is the standby for theatres 3 and 4. The steam for sterile services comes from one boiler house. That is how the page knows a job on chiller 2 matters to theatres 3 and 4.
Planned or fault.
Plant taken off for a planned service is not a fault, and the page does not call it one. A planned service on the only chiller that is proven is another matter, and the page says so.
Signed off, and the same every time.
Nothing is guessed. The same readings give the same report every time, and every sentence can be traced to its readings, its rule and its time. There is no generative AI in it. At the Belfast Trust the logic for what depends on what was written this way with the Trust's own engineers. The rules for what fixed looks like are new.
Your first contract is half price for the first 12 months.
Pick one contract where the plant matters and the contract carries deductions. Tell us the buildings and we give you a fixed price. Your first contract is half that price for the first 12 months.
It starts with the takeover check.
We connect the systems, match your jobs to the plant, write the rules with your engineers and run it. Your contract manager has the page each morning. Our engineers are on your site for the set-up.
Four things.
Your client's agreement to the systems being read. We write the request and the note for his IT security team. Read-only access to your work order system. A named contract manager. Time with your engineers to write the rules. We can give you the fixed price from the list of buildings and systems while your client's agreement is being sought.
Contracts where the plant matters.
Hospitals, prisons, data centres and laboratories, where your contract carries deductions and standby matters. A contract that is mostly doors, lights and fabric will get little from it, and we will tell you so.
It is your page. It is not there to catch anyone out.
It is yours.
You appoint us, so the record is yours. What it finds goes to your contract manager the same day, as a job to finish. We agree who sees what before we start, including where your client already has CIDE-OS on the building.
We are not your competitor.
We are not an FM contractor. We do not carry out FM contracts and we do not bid for them.
Nothing is said about a person.
It records what the plant did and when. A job that did not fix the plant goes back to the contract manager as a job to finish.
You decide what they are told.
What it finds on a subcontractor's plant goes to your contract manager first. He passes it on, with the readings.
It reads what is already there. We run it.
Read from the systems already on the building.
The systems your client agrees to: the BMS, power, generators, UPS, fire alarm, lifts, access control and metering, whoever installed them. Each is read the way it already talks. The fire alarm is read one way only, and nothing can be sent back to the panel. Nothing is taken out or replaced.
Read from your own system.
Your helpdesk and work order system stay as they are. CIDE-OS reads the jobs from it and cannot change them. With a direct connection a closed job is checked the same day. With a daily file it is checked the next morning. There is nothing new for your engineers to fill in.
His systems, so he has to agree.
The BMS and the other building systems belong to your client. He has to agree to them being read. We write the request and the technical note for his IT security team, and you send it.
We do it.
The asset names in a work order system rarely match the names in the BMS. We match them at set-up and you check the list.
It is read-only and controls nothing.
It cannot switch, set or override anything. It never replaces a permit or a lock-off. It does not replace your statutory records or your Authorised Person. The data is held in the UK.
We write the software and we commission the plant.
34 years on building systems.
We have integrated and commissioned building controls since 1992, with our own directly employed engineers.
The software already reads 245,071 points.
CIDE-OS is running the digitisation of the Belfast Trust estate across the Royal and City sites. It reads the BMS, SCADA, generators, boilers and sterile services that were already there. About 2,900 of those points carry the rules, and each one is checked before it is used. We can arrange a reference call with the Belfast Trust about the software.
The software and the method.
Reading a whole estate, writing the rules down with its engineers, and one plain sentence for the person in charge are all in use at the Belfast Trust.
Work orders checked against the plant.
Checking closed jobs against the plant on an FM contract is new, and we would rather say that plainly. It is why your first contract is half price for the first 12 months.
Schneider EcoXpert · Tridium Niagara · BCIA · Safe-T-Cert · ISO 9001 · Cyber Essentials Plus
Can we have 20 minutes with you and your contract manager to show it on a screen?
Your first contract is half price for the first 12 months. Philip will come to you, or you can spend a morning at OKTOLabs in Lisburn and see it on test rigs with real plant.
Book 20 minutes on a screenPhilip Dowds · Managing Director · OKTO Integrated Services Ltd
Lisburn office +44 (0)28 9266 7030 · Philip's mobile +44 (0)7860 356124
Unit 1 Crescent Business Park · Lisburn BT28 2GN
London office · 25 Wilton Road · Pimlico · London SW1V 1LW